MANURE TANK


Nowadays, time is the deciding factor of every farmer. Therefore, large-area formwork on the construction site is indispensable. With our tried, tested and repeatedly improved formwork system we facilitate the work processes. Formwork elements up to 430 cm in height are moved by a mobile crane from our company. The ceiling formwork brought along is quick and easy to install. An optimal ceiling load is achieved by means of a 'mushroom' column.

Also available only in Austria:

- external formwork and internal formwork (large-area formwork)

- Bricklayer and truck driver with crane

- ceiling formwork

- Column formwork, iron section

- sealing tape

- Formwork accessories

- Formwork transport

- Ceiling load 2.5 t, block load (truck passable 40 t)

- 1x ceiling opening 200 x 100/110 cm

Vertrieb Oesterreich

Sales via HÖRMANN Interstall GmbH & Co. KG
Bahnhofstraße 17 | A-3352 St.Peter / AU

- Easy operations with four different formwork systems
- 3 m to 34 m in diameter
- 10 m to 3600 m³ capacity
- Formwork elements up to 430 cm in height
- Ceiling formwork for passable ceilings
- Optimal ceiling load by means of 'mushroom' column

 


 

The following dimensions are possible

- System 1: Formwork in boxes of 3-9 m diameter
- System 2: large area formwork of 7-11 m diameter
- System 3: XL formwork of 12-14 m diameter
- System 4: Formwork of 16-37 m

Guellebehaelter (2)


OUR MANUFACTURING DEPTH PROMISES
PERFECT QUALITY AND LONGEVITY

 

We use cookies on our website. Some of them are essential for the operation of the site, while others help us to improve this site and the user experience (tracking cookies). You can decide for yourself whether you want to allow cookies or not. Please note that if you reject them, you may not be able to use all the functionalities of the site.